Arlington 2014: Part 6: Additional Details

February 8, 2014
0.0%

This Old House - S35 - E14

Arlington 2014: Part 6: Additional Details

The new kitchen windows are inspected. Cast iron waste pipes are installed with a traditional lead and oakum joint. Outside -- trim is replicated and new siding is installed.

This Old House: Season 35 - 26 Episode s