Hometime: Season 23 - 26 Episode s
23x1 - Digging Out the Yard
February 7, 2009
The Hometime crew re-grades a sloping back yard, installs a drainage system, and begins building a series of paver patios.
23x2 - Urban Terraces
February 14, 2009
The Hometime crew weaves several retaining walls, steps, and patios into a small, sloped back yard.
23x3 - Caretaker's Home
February 21, 2009
The Hometime crew restores the porch of what was once the caretaker’s home on a 40-acre, turn-of-the-century lakeside estate.
23x4 - Entrance Plaza
March 7, 2009
The Hometime crew renovates a church courtyard with a textured concrete walkway, custom wood benches, and a raised planting bed.
23x5 - Betsy-Tacy Home: Decoration
April 4, 2009
The Hometime crew makes its last visit to this historic home to create a sidewalk outside and to finish painting and wallpapering the interior.
23x6 - Eat-In-Kitchen: Demolition
April 11, 2009
The Hometime crew takes a small kitchen and starts work to improve storage and functionality.
23x7 - Eat-In-Kitchen: Cabinets
April 18, 2009
The Hometime crew installs new kitchen cabinets, a new sliding door and new floor tile.
23x8 - Eat-In-Kitchen: Wrap Up
April 25, 2009
The Hometime crew installs countertops and appliances, as well as a new wood floor for the adjacent living room.
23x9 - Sculpture Studio: Framing
May 2, 2009
The Hometime crew converts an unused, tuck-under garage into a metal-working studio with a new heater and a downsized garage door.
23x10 - Sculpture Studio: Finishing
May 9, 2009
The Hometime crew wraps up the workshop with doors, windows and welding equipment.
23x11 - Great Room Hardwood Floor
September 5, 2009
The Hometime crew installs a super-hard, prefinished wood floor.
23x12 - Travertine Floor
September 12, 2009
The Hometime crew installs large-format limestone flooring.
23x13 - Seven-Year Plan
September 19, 2009
The Hometime crew works with a designer to identify and prioritize a house-wide makeover. Then they begin with the first phase: tearing apart the living room and dining room.
23x14 - Kitchen Facelift
September 26, 2009
The Hometime crew transforms a kitchen with re-faced cabinets along with new counters, tile, appliances and lighting.
23x15 - Great Room Update
October 3, 2009
The Hometime crew uses new trim, wood flooring, lighting, paint and furniture to transform a dated, 1970s living room and dining room.
23x16 - Linoleum Flooring
October 10, 2009
The Hometime crew installs sheet and tile linoleum on the Hometime log cabin basement floor.
23x17 - Cabin Kitchen Upgrade
October 17, 2009
The Hometime crew modifies and upgrades cabinets, appliances, countertops and plumbing fixtures.
23x18 - Vacation Home Laundry Room
October 24, 2009
The Hometime crew adds new cabinets and plumbing fixtures to a log cabin lower level.
23x19 - Historic Summer Home -- Structural Upgrades
October 31, 2009
Dean, Miriam and the Hometime crew remove cabinets, asbestos flooring and a concrete slab then ingeniously reinforce sagging walls and pour a new concrete kitchen floor.
23x20 - Historic Summer Home -- Kitchen
November 7, 2009
Dean, Miriam and the Hometime crew rebuild old cabinets and install historically sensitive countertops, flooring, fixtures and appliances remodeling this 100-year-old kitchen.
23x21 - Barrel Vault Basement
November 14, 2009
The Hometime crew transforms a bland, unfinished basement by juggling doors and windows, repairing humps and cracks in the floor, and creating an arched ceiling.
23x22 - Party Kitchen
November 21, 2009
The Hometime crew puts in doors, tile and cabinets for the basement wet bar and peninsula.
23x23 - Arched Wood Panels
November 28, 2009
The Hometime crew puts in granite countertops and a trendy shower door then wrap up the custom wood paneling around a basement fireplace.
23x24 - Attic Trusses
December 5, 2009
The Hometime crew shores up the block walls then uses attic trusses to create a room over a flat-roofed, detached garage.
23x25 - Standalone Garage
December 12, 2009
The Hometime crew seals up the exterior of the garage and the new studio above it.
23x26 - Yoga Studio
December 19, 2009
The upstairs studio gets paint, flooring, and lighting. The downstairs garage gets flooring and cabinets.