Hometime: Season 26 - 26 Episode s
26x1 - Exterior Harmony: Doors and Stone
February 4, 2012
The new home’s architecture is enhanced with continuity of garage doors, entry doors and shutters as the foundation is covered with natural thin veneer stone.
26x2 - Exterior Harmony: Driveway and Walkway
February 11, 2012
Dean, Miriam, Dan and Bucky pitch in to install a paver driveway, walkway and step veneer.
26x3 - Kitchen and Mud Room Remodel 1
March 3, 2012
Dean, Miriam, and the Hometime crew begin updating the 1970’s remodel of a 1911 kitchen with new windows and a new patio door in the bumpout.
26x4 - Kitchen and Mud Room Remodel 2
March 10, 2012
Double hung windows are updated with new inserts as Hometime guts the kitchen and reframes the powder room for a pocket door.
26x5 - Kitchen and Mud Room Remodel 3
March 17, 2012
Dean and Miriam finish up rough-ins, insulation, drywall and priming to get ready for new cabinets.
26x6 - Kitchen and Mud Room Remodel 4
March 24, 2012
Dean and Miriam show how to blend two different finishes as they install new cabinets.
26x7 - Kitchen and Mud Room Remodel 5
March 31, 2012
Dean and Miriam get the kitchen, mud room and powder room areas ready for new flooring and countertops.
26x8 - Kitchen and Mud Room Remodel 6
April 7, 2012
It’s time for finishing touches as Dean and Miriam trim out the kitchen, mud room and powder room.
26x9 - Kitchen and Mud Room Remodel 7
April 14, 2012
Dean, Miriam and the Hometime crew fire up the fixtures and appliances as they wrap up the project.
26x10 - Front Entry Curb Appeal
April 21, 2012
Dean and Miriam look at roofing, stone, garage doors and stamped concrete from the curb appeal perspective as a new home is built.
26x11 - Screen Porch Highlights
April 28, 2012
Dean and Miriam talk about roofing, railings and a realistic gas fireplace during the construction of a screen porch.
26x12 - Homes for a Home Show
May 5, 2012
Dean and Miriam document the construction of two new homes, built inside a home and garden show.
26x13 - Quartz Kitchen Remodel
May 12, 2012
Dean, Miriam and the crew demo some old kitchen countertops and install new quartz surfaces.
26x14 - Exterior Harmony: Landscape Wrap
October 6, 2012
Finishing a hilly back yard with landscape steps and tile, a fire ring, plants and sprinklers.
26x15 - North Woods Trees
October 13, 2012
Planting site-appropriate trees after a storm and building a crib for firewood cut and split from the damaged timber.
26x16 - Timber Shed Wall Framing
October 20, 2012
Pre-building timber frame walls inside and re-building on a new slab near Hometime Log Cabin.
26x17 - Timber Shed Roof Framing
October 27, 2012
Pre-building timber frame style roof trusses inside and re-assembling those on site as shed construction continues.
26x18 - Stamped Concrete Patio Demo
November 3, 2012
Taking out old concrete to repair, reframe and reseal the patio over a storage area.
26x19 - Stamped Concrete Patio Re-Poured
November 10, 2012
Re-pouring and re-stamping the concrete patio while fixing up the storage area below.
26x20 - Built-In Gas Grill
November 17, 2012
Resetting an outdoor natural stone island, covering it with granite and setting a new built-in gas grill.
26x21 - Island Kitchen 2.0: Cabinets
November 24, 2012
Updating an island kitchen with new cabinets includes visits with the designer and the manufacturer.
26x22 - Island Kitchen 2.0: Countertops
December 1, 2012
Finishing up the new cabinets for the island kitchen and covering those with new countertops.
26x23 - Island Kitchen 2.0: Appliances
December 8, 2012
Installing lights, plumbing fixtures and appliances.
26x24 - Timber Shed Doors
December 15, 2012
Installing custom carriage house doors and laying a system of tailored pavers.
26x25 - Timber Shed Roof and Stone
December 22, 2012
Installing clay tile roofing and natural stone cladding for the walls.
26x26 - Timber Shed Finishing Touches
December 29, 2012
Finishing up the exterior and getting the new shed ready for winter.