- wSerie
- TV Shows
- Mega Shippers
- Season 3
- Episode 3
Satellite/Liverpool Flyover/Wood Ship
Mega Shippers - S3 - E3
Massive machines are brought in to move a raised dual carriage way. Plus, a team race against time to underload a shipment of timber.
Mega Shippers: Season 3 - 10 Episode s
3x1 - Carriage 58/Yachts/Steel Ship
August 11, 2020
Kieran struggles to get a 26-tonne train rolling for the first time in 60 years. Plus, Colin has 48 hours to load ten valuable racing yachts.
3x2 - Jack Up Rig P1 - Darwin/Mining Machine
August 18, 2020
A heavy lift vessel takes onboard a 23,000-tonne oil rig. Plus, a blanket of fog keeps one of the world's biggest airplanes grounded.
3x3 - Satellite/Liverpool Flyover/Wood Ship
August 25, 2020
Massive machines are brought in to move a raised dual carriage way. Plus, a team race against time to underload a shipment of timber.
3x4 - Gantry Cranes P1 - China/Herb Isles/Sand Ship
September 1, 2020
It's a race against time as six massive container cranes have to be loaded in three days. And, a ferry is in urgent need of repair.
3x5 - Rotor/Super Cars/Fertiliser Ship
September 8, 2020
Craig has 48 hours to get four super cars to Spain. Meanwhile, rain threatens to ruin an incoming shipment of fertiliser worth up to £45,000,000.
3x6 - Monopiles P1/King Edward Train
September 15, 2020
One of the biggest heavy lift vessels in the world is squeezed through a narrow canal in Germany. Plus, a 90-tonne locomotive is loaded onto a truck.
3x7 - Jack Up Rig P2 - Melbourne/Boat Doors/Christmas Trees
September 22, 2020
A 23,000-tonne oil rig needs offloading in Melbourne. Plus, a driver battles bad weather to deliver Christmas trees.
3x8 - Gantry Cranes P2-Miami/Cables/Pastor Pete
September 29, 2020
In Miami, there are just two days to unload six container cranes. Meanwhile, Martin has to check and store 1,200 metres of mooring ropes.
3x9 - New Haven Bridge/Sawn Timber/Flying Fish
October 6, 2020
Mark has to offload 2,800 tonnes of timber before the weather turns, while Chris transports a 57-metre-long bridge section.
3x10 - Monopiles-P2/Spanish Trains/Refuse Bails
October 13, 2020
The loading of wind turbine sections threatens to capsize a ship. Plus, 3,000 bales of compacted rubbish are shipped to Sweden.