The Salem House - 4

October 21, 1995
0.0%

This Old House - S17 - E4

The Salem House - 4

On a hot July day, the crew got the existing children's bath and future master bath. They discover a flooring system that probably cna't support the heavy load of two bathrooms' worth of china and tile, and decide to beef it up before starting the rough plumbing. Up on the roof, mason Lenny Belleveau reflashes and repoints the chimneys, replacing a poorly built cricket and sealing it with a rubber membrane. Painting contractor Mike McManus powerwashes the building, and architecture students measure the building to prepare ""as-built"" drawings for the architects to use. Architect Pamela Hawkes visits the site and considers a suggestion of cutting through the house's rear ell with a porte cochere to gain access to the back yard and solve the parking problem.

This Old House: Season 17 - 26 Episode s